The gateway to Europe's
integrated metrology community.

AC Power measurement at 50 Hz

Project Description

All 17 countries participating in the comparison of AC power measurements have performed the measurements, and all have sent their results more or less in form of reports.
The common final report has still to be elaborated.
This is planned during the first half of the year 2002

The project was agreed at the EUROMET AC power experts meeting at SP in Sweden on 3 and 4 May 1994.
The intercomparison is paralleled by a CCE comparison at the same measurement conditions.


Final Report 2006-09-20

All the participants have performed the measurements and submitted their reports.
A support group consisting of members from OMH, SP and PTB has been appointed.

Draft A report was circulated among the participants.
Considering the comments of the participants, the Draft B report was prepared and approved by the CCEM-WGLF and the CCEM itself.

The final report together with the link to CCEM-K5 will soon be published in the KCDB.
Therewith, project 385 is completed.

 

Subjects
Electricity and Magnetism (EM)
Coordinator
Dr Rainer Bergeest, PTB (Germany)
Coordinating Institute
PTB (Germany)
Further Partners
AREPA
BMS
INETI
VTT

Information

Reg. No.
385
Collaboration Type
Comparison
Status
completed
Starting
1996-11-01