The gateway to Europe's
integrated metrology community.
Subject Reg. No. Starting TITLE Coordinating Institute Status Collaboration Type KCDB
M 1664 2024-07-01 Finalisation of the "Guidelines for Realisation of the Mass Scale" CMI in progress Consultation
T 1663 2023-09-01 Hybrid comparison of measurements from -90 °C to 0.01 °C MIRS/UL-FE/LMK in progress Comparison
M 1662 2024-05-01 Finalisation of the draft "Guideline on the Calibration of Automatic Gravimetric Filling Instruments" MIRS in progress Consultation
MC 1621 2024-04-22 Supplementary comparison for critical elements in Li-ion battery black mass LNE in progress Comparison
M 1620 2024-04-22 Guidelines for the traceability and uncertainty evaluation in absolute gravity measurements INRIM in progress Consultation
MC 1619 2024-02-01 Key comparison on Borate Buffer GUM in progress Comparison EURAMET.QM-K19.2018
MC 1618 2024-03-01 Bilateral comparison of analytical capabilities for nitrogen dioxide (NO2) gas mixtures LNE in progress Comparison
F 1617 2024-03-19 Calibration of volumetric and piston operating instruments IPQ completed Comparison
F 1616 2024-03-11 Bilateral hybrid comparison: High flow rate water - 150 t/h to 1200 t/h VSL completed Comparison
Q 1615 2024-01-23 Peer review of calibration and measurement capabilities in the field of electrical quantities LNE in progress Consultation
Q 1614 2024-02-01 On-site peer review of FGI-GG National Standard Laboratory for acceleration of free fall INRIM in progress Consultation
F 1613 2023-11-01 Pilot study for comparison of flow quantities on microfluidic transfer standards LNE-CETIAT in progress Comparison
Q 1612 2024-03-01 Initial on-site peer review of STUK Measurement and Analysis laboratory STUK completed Consultation
PR 1611 2024-01-01 Traceability of the GAW-PFR reference Precision Filter Radiometers to the SI PMOD/WRC ongoing Traceabillity
T 1610 2024-01-01 Consultation on humidity standards and provision of traceability to LACOMET INRIM in progress Consultation
MC 1609 2023-03-01 Ongoing consultation between NPL and NIST NPL ongoing Consultation
F 1608 2024-01-02 Calibration of micropipettes using the air displacement method IPQ in progress Research
M 1607 2024-01-10 Hybrid bilateral comparison in viscosity determination PTB in progress Comparison
Q 1606 2023-12-01 On-site peer review of ILNAS (Luxembourg) METAS completed Consultation
Q 1605 2024-01-02 On-site peer review of DPM (Albania) EIM completed Consultation
1244 result(s)